Risk based maintenance management

Athena - Sines 4IM2C launches its tailor made solution towards risk based maintenance management.
Managing your assets is all about managing risks; from reducing risks to crew, environment, vessel and ensure compliancyInterne link with all legislation to smart maintenance and strategic stock control to minimize the risk of downtime on your operations-critical systems.

When focusing on maximizing your asset operations uptime and therefore determining strategic stock, critical processes and maintenance schedules that fit your operational needs, you will find yourself going through a time-consuming process of analyzing consequence of failure, often not giving you the desired results

Rather than evaluating every process on your asset, IM2C takes your existing structures (i.e. technical account structures from any PMS), and first of all excludes the non-essentials. By doing so, the most important functions and subsystems are determined in an early stage of the process.
The value of the separate functions and systems are also intensively communicated with your technical staff, so the right level of criticality is chosen; not just on theoretical values, but combined with experience from your staff.

The result: a maintenance management plan, that is connected to your organization at all levels; not a report that will end up in a drawer, but a useable management tool.

risk matrix